This is a real packet, from a real bathroom. One homeowner measured and photographed their own room on a phone. Nothing here was written by us, and nothing has been tidied up. You are seeing exactly what a contractor bidding this job sees: the town, not the street, and no homeowner's name until one of them wins it.
How bidding and payment work

Scope of Work

Bathroom remodel · Somerset County · v1.0 · packet 66d9f6e3

Project summary

Budget range: $15k–25k. Timeline: No rush. House built 1987.

Redo bathroom: replace shower, toilet, vanity, light, maybe tile

Measurements (16)

The homeowner counted 1 window, 1 doorway, 1 sink.

MeasurementValueEvidence
Room, wall to wall at the floor — the long way68.5 in ✓ tape photo
Room, wall to wall at the floor — the short way60 in ✓ tape photo
Floor to ceiling96 in ✓ tape photo
Doorway, the finished opening, side to side28 in ✓ tape photo
Doorway, the finished opening, floor to top80 in ✓ tape photo
Window, side to side31 in ✓ tape photo
Window, top to bottom40 in ✓ tape photo
Window sill down to the floor46 in ✓ tape photo
Vanity, side to side36 in ✓ tape photo
Vanity, front to wall22 in ✓ tape photo
Floor to the top of the vanity32 in ✓ tape photo
Tub or shower, the long way46 in ✓ tape photo
Tub or shower, the short way33 in ✓ tape photo
Floor to the top of the tub wall or shower curb74 in ✓ tape photo
Finished wall behind the toilet, to the center of the bolts at its base30 in ✓ tape photo
Vanity edge across to the center of the toilet14 in ✓ tape photo

Every line marked with a tape photo has a photograph of the tape in place, in the photo index below. A line without one is the homeowner’s reading and is worth confirming on the walkthrough.

How the homeowner expects to pay

In stages, through One Walkthrough. The homeowner pays for each stage as it starts. The money reaches the contractor when the homeowner approves the finished work, or five business days after the contractor says it is done if the homeowner neither approves it nor says what is wrong. Paying this way costs the contractor 1.5% of what goes through, never more than $1,500, and each bid shows how much of that the contractor has added to their price.

Nothing is settled here. The homeowner and the contractor can agree something else on the walkthrough, and if it changes after the bids are in, the contractor can change their price to match.

Existing conditions, in the homeowner’s words
Stand in four places around the room and shift your weight. Does the floor feel soft or springy anywhere? → No Run the extractor fan and hold a square of toilet paper against the grille. Does it hold there, or fall? → No fan Sit on the toilet and lean side to side. Does it move at all? → No Run the sink and the shower at the same time. Does the shower get noticeably weaker? → No For every stain, crack or soft patch you photographed: what do you know about each one? → None seen Does the door clear the floor covering when it swings? → Yes Any smell of damp in the room? → No WHAT THE HOMEOWNER KNOWS ABOUT THE HISTORY When was this room last worked on, and who did it? → Never as far as I know except maybe paint Has anything ever leaked in this room, or into the room below it? → No What is directly underneath this room, and is there any stain on that ceiling? → Kitchen Open the vanity and look at the supply pipes. Copper, white plastic, or gray metal? → Copper and plastic Has the electrical panel been replaced, and do you know roughly when? → Original Has the house ever had a water or fire insurance claim? → No GETTING THE WORK DONE Is this the only full bathroom in the house? → No Which floor is it on, and how many flights of stairs to reach it? → 2nd Where can a van park, and is there room for a dumpster? → Street, not sure where dumpster could go according to HOA Will anyone be living in the house while the work happens? → Yes Any pets, and where will they be? → No Any HOA, historic district, condo or co-op rules that apply? → HOA but doesn’t involve bathrooms When would you like it to start? → No rush
Allowances the homeowner has set
#ItemUnitAllowance
1Toilet, suppliedEA$500
2Light fixture and fan, suppliedEA$125

This packet was measured and photographed by the homeowner, not by us. There is no line-item breakdown: the scope is the photographs, the measurements and the conditions above. Bid the project as you would price it, carry the allowances shown as materials, state your contingency separately, and list what you have assumed. Every contractor is working from this same document, and the assumptions you write are shown to the homeowner beside your number.

Photo index (31)

Tap any photograph to see it full size.

Standing in the doorway, the whole room
1. Standing in the doorway, the whole room
From the far corner, looking back at the door
2. From the far corner, looking back at the door
The vanity straight on, whole unit and mirror
3. The vanity straight on, whole unit and mirror
Under the vanity with the doors open, so the pipes are visible
4. Under the vanity with the doors open, so the pipes are visible
The toilet straight on, including the floor around its base
5. The toilet straight on, including the floor around its base
The tub or shower straight on
6. The tub or shower straight on
Close up of the shower handle and trim
7. Close up of the shower handle and trim
The tub spout and the overflow plate
8. The tub spout and the overflow plate
The floor close up, including the strip at the doorway
9. The floor close up, including the strip at the doorway
The whole ceiling
10. The whole ceiling
Any outlet, close enough to read whether it has small TEST and RESET buttons
11. Any outlet, close enough to read whether it has small TEST and RESET buttons
The window from inside
12. The window from inside
The door open, showing which side the hinges are on
13. The door open, showing which side the hinges are on
The water heater, close enough to read its label
14. The water heater, close enough to read its label
The main water shutoff for the house
15. The main water shutoff for the house
Tape in place: Room, wall to wall at the floor — the long way
16. Tape in place: Room, wall to wall at the floor — the long way
Tape in place: Room, wall to wall at the floor — the short way
17. Tape in place: Room, wall to wall at the floor — the short way
Tape in place: Floor to ceiling
18. Tape in place: Floor to ceiling
Tape in place: Doorway, the finished opening, side to side
19. Tape in place: Doorway, the finished opening, side to side
Tape in place: Doorway, the finished opening, floor to top
20. Tape in place: Doorway, the finished opening, floor to top
Tape in place: Window, side to side
21. Tape in place: Window, side to side
Tape in place: Window, top to bottom
22. Tape in place: Window, top to bottom
Tape in place: Window sill down to the floor
23. Tape in place: Window sill down to the floor
Tape in place: Vanity, side to side
24. Tape in place: Vanity, side to side
Tape in place: Vanity, front to wall
25. Tape in place: Vanity, front to wall
Tape in place: Floor to the top of the vanity
26. Tape in place: Floor to the top of the vanity
Tape in place: Tub or shower, the long way
27. Tape in place: Tub or shower, the long way
Tape in place: Tub or shower, the short way
28. Tape in place: Tub or shower, the short way
Tape in place: Floor to the top of the tub wall or shower curb
29. Tape in place: Floor to the top of the tub wall or shower curb
Tape in place: Finished wall behind the toilet, to the center of the bolts at its base
30. Tape in place: Finished wall behind the toilet, to the center of the bolts at its base
Tape in place: Vanity edge across to the center of the toilet
31. Tape in place: Vanity edge across to the center of the toilet